MillerLegg
 
About Us
Services
International
Projects
Engineering
Surveying
Planning
Landscape Architecture
Streetscapes & Corridors
Resorts
Recreational
Residential
Commercial/Institutional

Environmental
Geographic Information Systems
Environmental Engineering
Careers
Contact Us
Join our team
Landscape Architecture
Streetscapes & Corridors


Biscayne Boulevard
(NE 5th Street to NE 13th Street)

Miami-Dade County, Florida

In order to continue the enhancements of the U.S. 1 Corridor for the City of Miami, Miller Legg developed a streetscape design to unify the area surrounding the American Airlines Arena Bicentennial Park and the new Performing Arts Center. Enhancement of the pedestrian corridor and integration with the existing Roberto Burle Marx paving design, directly to the south, was integral in the design of the project.

Miller Legg coordinated with the City of Miami during the design process, participated in numerous public involvement and design meetings, and incorporated access management concepts, including limited vehicular access and multi-modal transportation. Improvements included specialty paving, lighting, irrigation and planting elements.

Client
Florida Department of Transportation - District VI
    

        view larger
  back